2 control execution command – Yokogawa DA100 User Manual

Page 62

Advertising
background image

IM DA100-11E

6-10

p4

Storage selection (ABORT, STORE)

Example

Store the calibrated values for the module in slot
1 of subunit 0.

XZ0, 1, END, STORE

Comments

• Connection

DC Voltage Measurement : Input a DC voltage
according to the measurement range to CH3.
CH2 is short-circuit.
Temperature Measurement using RTD : Input
100

to CH5. CH4 is short-circuit.

• Caribrate the high sensitive RTD after

calibrating of 60mV and 200mV ranges.

• Be sure to execute STORE using A/D

calibration end processing every time an A/D
calibration/adjustment for one module is
completed. If A/D calibration end processing
(STORE) is not executed, the calibrated data
are ineffective.

• Since it takes an indefinite time to execute an

XZ command, return an ACK after the
processing is over.
On the controller side, execute the following
processing after receiving the ACK after
transmitting an XE command. The ACK status
format is as follows:
E0Cr+Lf: The received command has been

normally processed.

E1Cr+Lf: There is an error in the received

command.

6.2

Control Execution
Command

AR

Executes an alarm reset.

Mode

Operation mode

Setting

ARp1<terminator>

p1

0, Execute the alarm reset.

Example

Execute the alarm reset.

AR0

IR

Executes an alarm reset.

Mode

Operation mode

Setting

IRp1<terminator>

p1

0, Execute the timer reset.

Example

Execute the timer reset.

IR0

EX

Computation start/stop, restart of
computed data after they are cleared,
and release of statuses after
completing measurement

Mode

Operation mode

Setting

EXp1<terminator>

p1

Computation start/stop, restart of
computed data after they are cleared, and
execution of releasing statuses after
completing measurement.
0: Computation start
1: Computation stop
2: Restart of computed data after they are

cleared

3: Computed data clear
4: Release of statuses after completing

measurement

Example

Start the computation.

EX0

Comments

• This command only works with the optional

computation function or if a pluse module is
installed.

• If MATH is set for level action in the event/

action, a computation start/stop/start after
clearing the computed data cannot be done
using the EX command

BL

Executes the initial balancing of the
strain input channel

Mode

Operation mode

Setting

BLp1, p2, p3<terminator>

p1

The first channel for executing the initial
balancing

p2

The last channel for executing the initial
balancing

p3

Select either initial balancing or
initialization

EXEC: Execute initial balancing
INIT: Execute initialization

Example

Execute initial balancing on subunit 0 and
channels 01 to 08.

BL001, 008, EXEC

Comments

• Channels other than strain input channels or

channels that are not connected within the
specified range are ignored.

• Initial balancing and initialization can not be

executed during a report.

6.2 Control Execution Command

Advertising