Installation – Sterling EV User Manual

Page 8

Advertising
background image

8

Figure 7 - Float Valve Assembly

NOTICE: There will be a slight odor during the initial
start-up of the unit. The odor will disappear within
the fi rst few days of operation if the bleed-off is
adjusted correctly.

Faucet Use
1. To connect the water line to the water supply, install

a sillcock and water valve on the faucet.

2. Place tubing nut and ferrule on tube end, and insert

valve.

3. Tighten the nuts on the valve and the tube.

NOTICE: If a faucet is not to be used for the water
supply, install the valve on the water line to be used.
Follow the procedure above for securing the tubing
to the valve.

Figure 8 - Evaporative Cooler Water Connections

Mounting to Roof
1. Before positioning the unit in its permanent

location, make certain that the roof is capable
of carrying the load of this equipment. Note that
when the cooler is fi lled with water, the unit will be
much heavier than when dry. See “Performance and
Dimension Data” table for appropriate operating

weight.

2. If unit is to be mounted on a curb, refer to the curb

specifi cations for installation requirements.

3. Make certain that the mounting surface is level in

all directions.

4. Make certain that you have suffi cient means for

lifting the unit into place.

5. Installation must conform to local and national

building and safety codes.

6. The units are mounted on skid rails and are suitable

for use on combustible fl ooring. It is recommended
that the skids be mounted either on solid planking or
on steel channels, but never on a soft tar roof where
the skids could sink and reduce the 4" clearance
between the bottom pan and the roof.

7. Inspect all internal parts of the cooler section to

determine if any damage has occurred during
shipment. See roof curb specifi cations at the end of
the manual.

Connecting the Water Supply

NOTICE: Soft water equipment should not be

attached to water lines going to the cooler. “Soft
Water” will cause corrosion and decrease the
effective life of the cooler.

1. A water valve should be installed at a convenient

location to allow water to be turned on and off. Use
1/4" tubing to supply water to Evaporative Cooler.
A water connector kit is available at your local

wholesaler.

2. Place tube nut and ferrule over the end of the

tubing.

3. Insert tubing into factory-installed fl oat valve and

tighten securely.

INSTALLATION

This manual is for Evaporative Cooler Module Installations only.

Refer to the Installation and Service Manuals for Rooftop Packaged Units

and Outdoor Furnaces for these unit installations.

3-1/4"

FLOAT VALVE

ROD LEVEL
ADJUSTMENT SCREW

1/4" TUBING
FROM COOLER

FAUCET WITH
HOSE BIBB

BRASS NEEDLE COCK

BRASS STOP COCK
WITH DRAIN

WATER SUPPLY

ROOF LINE

NUT AND FERRULE

D3870

Advertising