Fill new tank through hose, Vcx-1, Page 5 – MAHLE RTI VCX-1 User Manual

Page 6

Advertising
background image

Page 5

(VACUUM)

(PRESSURE)

VCX-1

HOME

FILL NEW TANK
EMPTY RADIATOR

FILL RADIATOR

FILL NEW TANK

EMPTY NEW TANK
TOP OFF

EMPTY NEW TANK

TOP OFF

HOME

HOME

EMPTY RADIATOR

EMPTY WASTE TANK

EMPTY WASTE TANK

WASTE COOLANT

NEW COOLANT

Fill New Tank through Hose

1.

Turn all panel valves to the Home position.

2.

Connect shop air to VCX Shop Air Coupler.

3.

Turn all panel valves to the Fill New Tank position as shown in the illustration below. This
orientation can also be obtained by positioning the panel valves toward the green highlights
closest to each valve.

4.

Place the Cone Adapter, with the Adapter Hose attached, into the container of new coolant.
Open the Cone Adapter Valve to draw coolant into the New Coolant Tank.

5.

Raise the hose out of the container of new coolant when the desired fluid level is reached in
the New Coolant Tank.

6.

Close the Cone Adapter Valve.

7.

Turn all valves to the Home position when done.

Note: DO NOT OVERFILL.

50/50 Mix Water/Coolant

Tank

New Coolant

Waste Coolant

Tank

Clear Hose

Cone Adapter

Adapter Hose

Valve

Advertising