Configuring the switch – Brocade Encryption Switch QuickStart Guide (Supporting Fabric OS v6.1.1_enc) User Manual
Page 11
Advertising
Encryption Switch QuickStart Guide
11 of 20
53-1001118-01
Configuring the switch
To configure the switch, perform the following tasks.
illustrates the flow of these configuration tasks.
•
Connecting a serial cable between switch and host . . . . . . . . . . . . . . . . . . 13
•
•
•
Logging off the serial console port and disconnecting the serial cable. . . 14
•
Connecting an Ethernet cable and opening a Telnet session . . . . . . . . . . . 14
•
•
•
Verifying correct operation and backing up the configuration . . . . . . . . . . 17
•
Installing SFPs and attaching cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
•
Advertising