Hired-Hand Mega Flow SlantWall Fans: Fan & Cone Installation User Manual

Page 7

Advertising
background image

HIRED-HAND MFG., INC.

• 1733 County Road 68 • Bremen, Alabama 35033 • Phone 256-287-1000 • Fax 256-287-2000

Manual Part No. 4801-5180 Rev 6-08 Page

7

of

10

Arrange panels for assembly
with pilot hole on each panel
facing upward.

Slot for mounting top of
cone to fan housing

Joints

Install #14 x 1/2" sm

screw

Install #14 x 1/2" sm
screw

Pilot hole faces upward

Pull flanges

together to

align

mounting

holes

Mounting
Hole for
Wire Guard





Packing List For One (1) 54

″ Unit

Tools Required

Four (4) Cone Sections

Four (4) Corner Brackets

7/16 in. (11 mm) Wrench

Ratchet

One (1) Wire Guard

Eight (8) 5/16"-18 x 5/8 Carriage

Bolts

7/16 in. (11 mm) Socket

Marker or Scribe

Five (5) 1/4"-20 Lock Nuts

Ten (10) #14 x 1/2" SIM Screws

Cordless drill and bit (For Installing TEK screws)

Four (4) ¼"-20 x 3/4" Bolts

One (1) Installation Manual


1.

Arrange panels contacting as shown in Figure 1. NOTE: The pilot hole pointing upward. Refer to Figure 7
Inset B.

2.

For each panel, slide panels together. See Figure 7 Inset A.

3.

Align holes of flanges. See Figure 7 Inset A. Install sheet metal screws as shown in Insets B and C.
































Mounting Holes for
Damper Ring

Figure 7

Inset A

Figure 7

Inset C

Figure 7:

Inset B

C O N E I N S T A L L A T I O N

5 4

Advertising