Side view, Top mounting brackets – Hired-Hand Mega-Cool rev 4-08 User Manual

Page 31

Advertising
background image

Part No. 4801-5093 Rev 4-08

Unitized System

Page 31



















































Top Mounting Brackets

1.

Install top mounting brackets for curtain installation. Mount end bracket in line
with end of cool cell system. Vertically position each bracket distance

″C″

from top 2

″x 6″ board as shown above (Refer to Installation Overview for the

framing you are installing, page 3 or 4).


2.

Top mounting brackets should be spaced by the horizontal distance given in
table at left depending upon which system you are installing.


3.

Secure top mounting brackets to wall board with ¼ x 1.5 Lag screws.

Side View

Horizontal Spacing

For Top Mounting Brackets

Back Plate

Spacing

8 ft.

4 ft.

10 ft.

5 ft.

12 ft.

6 ft.

Insert ¼ xx 1.5 Lag Screws through
flange of bracket.

Make sure 2

″x 6″ board is at

proper height. See tables on
pages 3 & 4.

″C″

Top
mounting
bracket

Distance

″C″

Framing

System

4

″ Pad

6

″ Pad

2

″ x 2″ &

2

″ x 6″

0.25

″ 0.25″

Single
2

″ x 6″

3.25

3.25

Measure from

top of mounting

flange.

Advertising
This manual is related to the following products: