Assembly instructions mdm products party tent – Rhino Shelter Party Tent 14W X 14L X 9H User Manual

Page 10

Advertising
background image

Assembly Instructions 14 X 20 X 9 Party Tent Style

V2.0 14 X 20 X 9 Size

Do NOT Return Unit to Store or Dealer. For all Questions or Shortages please call MDM Products LLC directly.

For Customer Service 800-447-7079 or 203-877-7070 8 AM – 5 PM EST

Assembly Instructions MDM Products Party Tent

Congratulations!


Congratulations on your purchase of a MDM Products Party Tent Shelter by MDM Products LLC. With proper installation,
use, and maintenance, your new unit will provide many years of good and suitable service. Your new MDM Products
Party Tent is a combination of excellent engineering and well thought out design.

The multiple part frame assembly is pre-drilled for easy insertion of hardware to assemble. The tubing is made from high-
grade steel tubing, to resist moisture and oxidation over the life of the shelter. The covering membrane is made from
ASTM-5 approved polyethylene materials. The cover is UV protected for continual exposure to the sunlight.

It is suggested that you read the entire assembly instructions completely before you begin. This will help attain the best
results for your installation.

SAFETY WARNING

The installation of this unit must conform to the requirements of all authorities having jurisdiction in your specific local

area. In the absence of such requirements, the assembly and installation must conform to the provided assembly and

installation instructions. MDM Products LLC will not be responsible for failure to comply with any requirements in a given

local area. Damages, consequential damages, or injuries caused by improper installation, alteration, improper use, or

damages caused by wind, rain or any acts of nature are strictly that of the user.

For installation assistance or Customer Service, please call 800-447-7079 or 203-380-2703, 8AM-5PM EST.
Cartons should be inspected upon delivery from carrier, and any evident damages should be noted on the bill of lading
before signing. If upon opening the cartons hidden damage is noted, contact carrier or its agent immediately. Claims for
shipping damage MUST be made with the shipping company. An inspection of the goods will most likely be required. Do
not discard packing or any components before the freight company’s inspection. All claims for freight damage must be
made with 15 days of receipt of the goods in accordance with ICC regulations.

ASSEMBLY PROCEDURE

The proper sequence and steps to install this unit will produce a proper and good installation. Failure to read and follow
these guidelines may not result in a proper installation and will void all warranty and protection the owner is entitled to with
the product. The steps to be undertaken are:

1. Read Assembly Instructions completely before beginning installation.
2. Prepare location and place both unit boxes near location site
3. Perform an inventory check before beginning to be certain all components are available for installation.
4. Assemble plastic feet to upright corner and interior legs of unit.
5. Assemble Roof Frame with Poles and Connectors.
6. Install Main Roof Cover over Roof Frame assembly.
7. Add Corner and Upright Legs to Roof Frame Assembly – one side at a time.
8. Install Sidewall Panels and End Panels as desired.
9. Place Frame into desired position and secure to ground with guy ropes and stakes.
10. Anchor frame assembly to ground with provided straps through upright feet.
11. Complete securing tent to ground with corner guy ropes and feet stakes.

TOOLS REQUIRED

The following hand tools will be needed for proper installation of your new MDM Products unit:

2lb Maul or Sledgehammer

Open End Adjustable Wrench or Sockets

Advertising
This manual is related to the following products: