Caution, Warning, Maintenance – Edwards Signaling 105DHIST-FJ User Manual

Page 2: Figure 1. mounting cat. no. 105bm mounting bracket

Advertising
background image

P/N 3100394 ISSUE 3

Figure 3. Securing the 105DHIST Series Beacon

to the 105PM Pipe Mount Attachment

CAUTION

Do not touch the strobe tube or halogen bulb with
bare fingers. Grasp the light source either by the
base or using a soft, clean cloth.

(4) Screws to mount

lens to 105PM

(supplied)

105HI-L Series

Lens

Hi-Intensity Strobe Base

Adhesive backed

gasket

105PM Pipe Mount

Attachment

3/4” (19 mm) Conduit

Nipple

Figure 1. Mounting Cat. No. 105BM Mounting Bracket

Adhesive backed

gasket

105BM Mounting

Bracket

(4) Screws to mount

105BM to 105BX

(supplied)

Adhesive backed

gasket

(2) Screws to mount

105BX to the

mounting surface

Mounting

Surface

(4) Screws to mount

lens to 105BM

(supplied)

105HI-L Series

Lens

Hi-Intensity Strobe Base

Maintenance

The lens should be periodically cleaned using a mild detergent and

water on a soft, clean, lint-free cloth.
Light Source Replacement

WARNING

To prevent electrical shock, before starting work on
units disconnect power and, for strobe modules
wait 5 minutes for stored energy to dissipate.

Strobe tube

Strobe tube base

Strobe tube

socket

105-L Series

Lens

Beacon Base
Gasket

Figure 2. Strobe Tube Replacement

1. Unscrew the lens from the base.

2. For Strobe Tube Replacement:

a. Grasp the strobe tube by its base and pull straight up out

of the strobe tube socket (Figure 2).

b. Grasp the new strobe tube by the strobe tube base and

press into the strobe tube socket.

3. Ensure that the clear gasket is on the base with the flared, open

end facing down. Screw the lens onto the base.

4. Apply power and verify operability.

Advertising