Control panel and level sensing, Service parts, 2hp grinder pumps – Blue Angel Pumps BAHGP2-2021E1 User Manual

Page 3: 6operating instructions, 3operating instructions

Advertising
background image

6

Operating Instructions

2HP Grinder Pumps

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

Figure 4 - BAGP1 Grinder Pump

Service Parts

SERVICE KITS

Cord Cap

Assembly

(1 and 4)

63014-001

Capacitors

(2 and 3)

63015-001

BAGP1-115

Capacitors

(2 and 3)

63030-001

BAGP1-2021

Motor Assembly

(5, 6, 7, 8, 9, 10,

11, 12 and 14)

63016-001

BAGP1-115

Motor Assembly

(5, 6, 7, 8, 9, 10,

11, 12 and 14)

63031-001

BAGP1-2021

Mechanical Shaft

(13)

63017-001

Pump Impeller

(15)

63018-001

Volute

(16)

63019-001

Grinder Assembly

(17 and 18)

63020-001

www.blueangelpumps.com

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

SERVICE KITS

Cord Cap

Assembly

(1 and 2)

63021-001

Motor Assembly

(3, 4, 5, 6, 7, 8,

10 and 11)

63022-001

Upper Mechanical

Seal (9)

63023-001

Lower Mechanical

Seal (12)

63024-001

Lower Seal

Housing (13)

63025-001

Volute (14)

63026-001

Pump Impeller

(15)

63027-001

Grinder Assembly

(16 and 17)

63028-001

Starting

Components

(not shown)

63029-001

Service Parts

For Replacement Parts or Technical Assistance, Call 1-888-636-6628

Please provide following information:

Address any correspondence to:

- Model number

Blue Angel

- Serial number (if any)

101 Production Drive

- Part description and number as shown in parts list

Harrison, OH 45030 U.S.A.

Figure 5 - BARDSGP1 Grinder Series

3

Operating Instructions

2HP Grinder Pumps

three power supply wires to reverse
the motor’s direction of rotation.

7. Install the pump in accordance with

all electrical codes that apply. Install
a fused disconnect switch or circuit
breaker in accordance with local
codes.

Risk of

electrical

shock. Pumps are supplied with a
grounding conductor on the power
cord. The grounding conductor is the
GREEN lead. To reduce the risk of electric
shock, be certain the ground conductor
is connected in the control box to the
grounding bar, which in connected to
a good suitable ground. The pump is
not safe to operate unless it is properly
grounded.

The double seal grinder pumps contain
an electrode for detecting water within
the unit. The electrode is housed within
the seal chamber, isolated from the
motor chamber by a mechanical shaft
seal. If the electrode detects water
within the oil-fi lled housing, it will close
the circuit to the alarm light in the
control panel, indicating the motor must
be serviced before the upper mechanical
shaft seal fails. The BLUE conductor is
connected to the seal leak probe.

Refer to Wiring Diagrams for model
specifi c wiring directions (See Figure 2).

Control Panel and
Level Sensing

BAGP1 & BADSGP1 grinder pumps
have internal start and run capacitors.
No control panel is required for
operating the pump. An alarm box is
recommended for high water alarm.
See Chart 2 for starting component
specifi cations per model.

BARDSGP1 and BAHGP2 models require
control boxes containing properly sized
start and run capacitors. Single-phase
models require a Single-Phase Control
Box with starting components equal to
specifi cations listed in Chart 2.

The three-phase models require a Three-
Phase Control Box with circuit breaker
and overload heaters per the chart.

Intrinsically safe type fl oat controls are
recommended for all applications. An
intrinsically safe control panel relay will
limit the current and voltage to the level
controls. A control panel can be supplied
with this type of circuitry.

Start Windings

Main Windings

Run Cap.

Start Cap.

Cent Switch

1.

WHITE

2.

BLA

C

K

3.

RED

BAGP1

BADSGP1

Main Windings

Main Windings

Start Windings

4

1

3

2

Start Cap.

Run Cap.

Thermal Sensor

1.

WHITE

2.

BLA

C

K

4.

LEAD

3.

RED

230 Volt 1 Phase

60Hz

1

2

3

7

8

9

4

5

6

1.

WHITE

2.

BLA

C

K

3.

RED

BL

UE

Moistur

e S

ensor

Thermal Sensor

WHITE

BROWN

230 Volt 3 Phase

60Hz

BARDSGP1-2023

1.

WHITE

2.

BLA

C

K

Start Windings

Main Windings

5

2

1

3.

RED

Run Cap.

Start Cap.

4.

BL

UE

Moistur

e S

ensor

BARDSGP1-2021/2001

230 VAC, 1 Phase 60 Hz

Start Relay

BAHGP2-2021

230 Volt 3 Phase

60Hz

4

5

7

1

8

2

1.

WHITE

2.

BLA

C

K

6

9

3

3.

RED

BAHGP2-2023

Figure 2 - Wiring Diagram

www.blueangelpumps.com

Model #

Start

Capacitor

Run

Capacitor

Starting

Relay

BAGP1-115 and
BADSGP1-115

200mF

250 Vac

70mF

250 Vac

NA

BAGP1-2021

270-300mF

250-370 Vac

30mF

300 Vac

NA

BARDSGP1-2021 and
BARDSGP1-2001

270-300mF

250-370 Vac

30mF

300 Vac

GE

3ARR3J3G3

BAHGP2-2021
BAHGP2-2021C and
BAHCP2-2021E1

400mF

250 Vac

90mF

250 Vac

Stearns

477104012401

Chart 2

Advertising