Setra System Model 230 User Manual

Page 5

Advertising
background image

5

2.8 optional 3-Valve manifold Procedure

the 3-Valve manifold assembly is normally shipped with valves V1 and V2 closed and V3 open.

To place the Model 230 into service:

1. Confirm valves V1 and V2 are closed and valve V3 is open.

2. Mount the manifold and install process connections.

3. Slowly open V2, then V1.

4. Slowly open bleed screws on the Model 230

(See “Bleeding the Pressure Ports”, section 2.7, to bleed the lines of air.)

5. Close the bleed screws on the Model 230

6. Close V3.

To take the 230 out of service:

1. Open V3 to equalize the pressure at the Model 230.

2. Close the V1 and V2.

3. Open the bleed screws on the Model 230.

3-Valve Manifold Description
Manifold Block

Brass

Valves (3)

V1 for connection to ±port

V2 for connection to -port

V3 for equalizing pressure


Valve Type

90 Degree On/Off

Process Connection 1/4 ”-18 NPT Internal
Thread

Model 230 Differential

Pressure Transducer

SHUNT VALVE

SHUT OFF

VALVE

V1

V2

V2

High Process Connection

1/4” NPT

Low Process Connection

1/4” NPT

Advertising