Chapter 5: maintenance, 1 preventative maintenance schedule – Sterlco SPS Series Pipe Shredder User Manual

Page 40

Advertising
background image

GRN4-610

Chapter 5: Maintenance

40 of 73

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

Only trained personnel may perform maintenance on the machine. The maintenance
must be performed within the specified time and also documented for records. Regular
maintenance is important to the continued effectiveness and efficiency of the machine.

Electrical voltage causes danger while starting the machine for
maintenance—the main switch MUST be turned to 0, the machine
must be safeguarded with a padlock, and a warning sign must be
attached.

Maintenance Plan

The following maintenance must be completed after every 8 operation hours:

• Check protective devices for proper function.

• Check mountings of cutters and bed knives.

• Check the condition of the cutters and bed knives.

The following maintenance must be completed after every 40 operation hours:

• Check that all screws are tightened.

• Check all wearing parts.

• Check hydraulic oil level and consistence.

The following maintenance must be completed after every 2000 operation hours:

• Check the oil level in the gearbox motor.

The following maintenance must be completed when necessary:

• Clean the machine.

• Check the main bearings (bearing clearance, lubricant renewal).

Yearly Maintenance:

• The purpose of yearly maintenance is to check the general condition of the

machine and to arrange for the arrival of any necessary replacement parts in good
time. A service engineer can assist in performing this task.

Advertising