Timeguard LEDX20PIRB User Manual

Page 6

Advertising
background image

LEDX10PIRB.1 & LEDX20PIRB.1 Instructs_147x105-R2a 1-6

02-12 -13 9.00PM

Prepared by Sally

1

2

3

4

5

6

(FRONT)

1. Designated Use

• LEDX10PIR and LEDX20PIR are an outdoor motion detector for
automatic LED lighting control.
• Mainly for wall installation.
• Simple plug in wall plate for easy & safe connection
• Suitable for a wide range of locations: corridors, gardens, staircases,
entrances, garages, outdoor parking areas etc.

Index :

Page 2

Contents and Tools required

Page 3

Connection and Installation procedure

Page 4

Installation procedure

Page 5

Sensor detection range

Page 6

Walk test & adjustment, Detector head adjustment

Page 7
Page 8

Lens masking

Page 9

Manual Override Mode, Lamp adjustment and Warning

2. Basic Safety Instruction

Danger of death through electric shock.
• Must only be installed by qualifi ed electricians.
• Avoid the metal parts of the device due to potentially high temperature.

• Designed for use in normal environments
• Intended for outdoor installation.
• Energy saving.
• Long LED lamp life time.

Page 10 Technical specifications

18

0

1.8

TO 2.

5 MET

ER

12 ME

TER

3 METER

18

0

1.8

TO 2.5 METER

12 ME

TER

3 METER

18

0

1.8

TO 2

.5 METER

12 ME

TER

3 METER

10

20

30

40

40

10

20

30

40

40

Detection Range:

LEDX10PIR and LEDX20PIR:

Recommended installation height is 2.5 meter above

ground, the maximum detection range about 12 meter and at the angle

of about 180 deg.

180°

up to12m

3m

18

0

2.5 METER

12 ME

TER

3 METER

180°

10

20

30

40

40

Setting advise and Knob settings

• Switch power on.

The detector head can be 90º turned left or right by hand and can be tilted
90º downward .

Detector Head Adjustment

Walk Test and Adjustment

The purpose of Walk Test is used to test and adjust the detection coverage of

LEDX10PIR and LEDX20PIR under auto mode.

• Adjust the Time knob to minimum (fully anti-clockwise), then conduct a

walk test as described in test procedure.

Test procedure:

• Adjust the Time knob to (fully anti-clockwise), (Lux knob can be “Sun” or

Moon”).

• Walk across the detection area, once the detector is triggered the lamp
will turn ON for 2 seconds.

Note walking direction when performing test.

* Do not use the adjuster knobs to turn

the detector head.

0

2

Sec

2 sec

Dusk

Time

Test mode

Tilt down 90º

Pan left 90º

Pan right 90º

Installation Advise:

WARNING

WARNING

As the detector reacts to variations in temperature, avoid situations:

• Do not install motion detectors near heat sources such as heating outlets,

air conditioning system, lamps etc.
• Do not direct the motion detector at objects that move in the wind such

as curtains, large plants etc.
• Take account of motion direction during test run.

• Do not direct motion detectors at objects with highly-reflective surface

such as mirrors etc.

3. Contents:

What’s in the box?

4. Tools required:

Tools / Equipment need for installation.

INSTRUCTIONS

MANUAL

X 1

X 1

X 1

X 2

X 2

X 1

Screw:

M4x32mm

Screw peg:

6x30mm

X 1

X 2

Screw: M3x12mm

X 1

X 1

X 1

Flat blade screw driver

Suitable for screw head

Drill bit with diameter 6mm

5

Connect device

to the mains.

Unit goes into

warm-up period

for 40 sec.

Connect the mains supply

cable to the on the terminal

block backplate as follows.

( See connection diagram )

CONNECTION

10

Loosen the screws.

Attach the

wallplate

to the device.

12

8

Connect the individual wires to the appropriate terminal then tighten

the screw.

First, feed the cable through the

rubber gasket of the junction box.

“Click”

Push

9

11

Attach the strain relief to the

device and screw in.

Tighten the screws.

6

7

EARTH

Attach the device to the U

bracket then tighten the

screws on both sides.

LIVE

NEUTRAL

EARTH

BLUE

GREEN / YELLOW

BROWN

• Conforms to the latest EC directives.

Connect the cable to the terminal block as follows

(see connection diagram):

Ensure the connections are secure. Refit wall plate ensuring it clicks

firmly into place.

5. Connection:

Switch off the electricity at the fuse box by removing the relevant fuse or

switching off the circuit breaker before proceeding with the installation.

*** IMPORTANT ***

2

3

1

230V

4

Mounting Srews: (M4 x 32mm) x 2

φ 6mm

Fix the U bracket to the wall.

Switch off the power.

Drill and push the screw

peg into the hole.

Marking the screw hole.

6. Installation Procedure:

LIVE

NEUTRAL

EARTH

BLUE

GREEN / YELLOW

BROWN

Mains

Supply

Isolation

Switch

N

L

E

Srews: (M3 x 12mm) x 2

Advertising
This manual is related to the following products: