3.1. Control Unit

This should be sited (following the recommendations
of BS8300) where it can best attract the attention of an
appropriate person/member of staff. An example of this is near
a reception desk in view of a receptionist.
Having located the site, install a flush or surface mount double
gang wall box at least 25mm deep.
Bring the mains supply cable (1mm

2

twin and earth) into the

box and connect to the terminals on the Control Unit marked
‘L’ and ‘N’ (see diagram). Connect the incoming wiring as
instructed below.

Mains Wiring
Important: All mains wiring should be provided in accordance
with the relevant national wiring rules
Bring the mains supply cable (1mm

2

TFE) into the box and

connect the Live and Neutral wires to the terminals on the
Control Unit marked ‘L’ and ‘N’ respectively.(see diagram)
Ensure the lengths of wires inside the connectors are prepared
correctly. Connection should be made firmly after all strands
are entered into the terminals.). Connect the incoming earth
wire as instructed below

nOTE: This is a class 1 apparatus if a metal box
is used and therefore the earth wire MUST be
connected to the earth terminal of the metal
box itself. If a plastic box is used, connect the
earth wire to the Earth connector marked
on the Control board.
On the stainless steel version, connect the
earth wire to the Earth connector on the
Control board. The metal box will be earthed
via the stainless steel screws provided.