Warning, Irculating, Ilters – Amana Gas Furnance S)8 User Manual

Page 22: Propane gas installation (typ.)

Advertising
background image

22

C

IRCULATING

A

IR

AND

F

ILTERS

200 PSIG

Maximum

5 to 15 PSIG

(20 PSIG Max.)

Continuous

11" W.C.

Second Stage

Regulator

First Stage

Regulator

Propane Gas Installation (Typ.)

P

ROPANE

G

AS

P

IPING

C

HARTS

3/8"

1/2"

5/8"

3/4"

7/8"

1/2"

3/4"

10

730

1,700

3,200

5,300

8,300

3,200

7,500

20

500

1,100

2,200

3,700

5,800

2,200

4,200

30

400

920

2,000

2,900

4,700

1,800

4,000

40

370

850

1,700

2,700

4,100

1,600

3,700

50

330

770

1,500

2,400

3,700

1,500

3,400

60

300

700

1,300

2,200

3,300

1,300

310

80

260

610

1,200

1,900

2,900

1,200

2,600

100

220

540

1,000

1,700

2,600

1,000

2,300

125

200

490

900

1,400

2,300

900

2,100

150

190

430

830

1,300

2,100

830

1,900

175

170

400

780

1,200

1,900

770

1,700

200

160

380

730

1,100

1,800

720

1,500

Sizing Between First and Second Stage Regulator*
Maximum Propane Capacities listed are based on 2 psig pressure drop at 10 psig setting.
Capacities in 1,000 BTU/hour.

Nominal Pipe Size

Schedule 40

Tubing Size, O.D. Type L

Pipe or

Tubing

Length,

Feet

3/8"

1/2"

5/8"

3/4"

7/8"

1-1/8"

1/2"

3/4"

1"

1-1/4" 1-1/2"

10

39

92

199

329

501

935

275

567

1,071 2,205 3,307

20

26

62

131

216

346

630

189

393

732

1,496 2,299

30

21

50

107

181

277

500

152

315

590

1,212 1,858

40

19

41

90

145

233

427

129

267

504

1,039 1,559

50

18

37

79

131

198

376

114

237

448

913

1,417

60

16

35

72

121

187

340

103

217

409

834

1,275

80

13

29

62

104

155

289

89

185

346

724

1,066

100

11

26

55

90

138

255

78

162

307

630

976

125

10

24

48

81

122

224

69

146

275

567

866

150

9

21

43

72

109

202

63

132

252

511

787

200

8

19

39

66

100

187

54

112

209

439

665

250

8

17

36

60

93

172

48

100

185

390

590

Pipe or

Tubing

Length,

Feet

Nominal Pipe Size

Schedule 40

Tubing Size, O.D. Type L

Sizing Between Second Stage and Appliance Regulator*
Maxim um Propane Capacities lis ted are bas ed on 2 ps ig pres s ure drop at 10 ps ig s etting.
Capacities in 1,000 BTU/hour.

C

IRCULATING

A

IR

AND

F

ILTERS

D

UCTWORK

- A

IR

F

LOW

N

EVER

 

ALLOW

 

THE

 

PRODUCTS

 

OF

 

COMBUSTION

INCLUDING

 

CARBON

 

MONOXIDE

TO

 

ENTER

 

THE

 

RETURN

 

DUCT

 

WORK

 

OR

 

CIRCULATION

 

AIR

 

SUPPLY

.

WARNING

Duct systems and register sizes must be properly designed for
the CFM and external static pressure rating of the furnace.
Ductwork should be designed in accordance with the recom-
mended methods of “Air Conditioning Contractors of America”
Manual D.

A duct system must be installed in accordance with Standards
of the National Board of Fire Underwriters for the Installation of
Air Conditioning, Warm Air Heating and Ventilating Systems.
Pamphlets No. 90A and 90B.

A closed return duct system must be used, with the return duct
connected to the furnace. NOTE: Ductwork must never be
attached to the back of the furnace. For installations requiring
more than 1800 CFM, use a bottom return or two sided return.
Supply and return connections to the furnace may be made
with flexible joints to reduce noise transmission. To prevent the
blower from interfering with combustion air or draft when a cen-
tral return is used, a connecting duct must be installed be-
tween the unit and the utility room wall. Furnace is shipped
with the top flanges in the flat position. Before installing a coil
or ducts, the flanges must be bent 90°. A room, closet, or
alcove must not be used as a return air chamber.

When the furnace is used in connection with a cooling unit, the
furnace should be installed in parallel with or on the upstream
side of the cooling unit to avoid condensation in the heating
element. With a parallel flow arrangement, the dampers or other
means used to control the flow of air must be adequate to
prevent chilled air from entering the furnace and, if manually
operated, must be equipped with means to prevent operation of
either unit unless the damper is in the full heat or cool position.

When the furnace is installed without a cooling coil, it is rec-
ommended that a removable access panel be provided in the
outlet air duct. This opening shall be accessible when the fur-
nace is installed and shall be of such a size that the heat
exchanger can be viewed for visual light inspection or such that
a sampling probe can be inserted into the airstream. The ac-
cess panel must be made to prevent air leaks when the furnace
is in operation.

NOTE: In a horizontal installation the air conditioning coil
must be adequately supported by proper brackets and
supports. Inadequate coil support can result in furnace cabinet
distortion and air leakage.

When the furnace is heating, the temperature of the return air
entering the furnace must be between 55°F and 100°F.

When a furnace is installed so that supply ducts carry air cir-
culated by the furnace to areas outside the space containing
the furnace, the return air shall also be handled by a duct sealed
to the furnace casing and terminating outside the space con-
taining the furnace.

C

HECKING

D

UCT

S

TATIC

Refer to your furnace rating plate for the maximum ESP (exter-
nal duct static) rating.

Total external static refers to everything external to the furnace
cabinet. Cooling coils, filters, ducts, grilles, registers must all
be considered when reading your total external static pres-
sure. The supply duct pressure must be read between the fur-

Advertising
This manual is related to the following products: