LG LW5012J User Manual

Page 12

Advertising
background image

Window Installation

Window opening measurements:

A

B

MODEL

Dimension

A(inch) Min

23 1/4”(59.1cm)

36”(91.4cm)

12 3/8”(31.4cm)

5000 BTU

A(inch) Max

B(inch) Min

A. Width

B. Height

Remove Packaging Materials

NOTE:The air conditioner must set upright for
one hour before operating.

Remove and dispose of/recycle packaging
materials. Remove tape and glue residue from
surfaces before turning on the air conditioner.

Rub a small amount of liquid dish soap over the

adhesive with your fingers.Wipe with warm
water and dry.

Do not use sharp instruments,rubbing alcohol,

flammable fluids,or abrasive cleaners to
remove tape or glue.These products can
damage the surface of your air conditioner.

Handle the air conditioner gently.

Unpack the Air Conditioner

Prepare Air Conditioner for Installation

1. Place the top channel on the top of the air

conditioner, lining up the holes in the top
channel with the holes in the top of the air
conditioner.

2. Using three

screws,attach the top

channel to the air conditioner.

Install Top Channel

NOTE: Your model may differ from the one

shown.

A.

” screws

B. Top channel

A

B

Advertising