Installation, Unpacking – AEG LAVAMAT 12820 User Manual

Page 46

Advertising
background image

46

Installation

Unpacking

All transit bolts and packing must be removed before using the appli-
ance.

Using a spanner,
unscrew and
remove the 2 rear
bottom screws.
Slide out the 2
plastic pins. Lay
the machine on
its back, taking
care not to squash
the hoses. This can be avoided by placing
one of the corner packing pieces between
the machine and the floor.

Remove the polystyrene block from the
bottom of the machine and release the two
plastic bags.

Carefully slide out the left-hand bag removing
it towards the right
and then down-
wards.

Slide out the right-
hand bag removing
it towards the left
and then upwards.
Set the machine
upright and
remove the
remaining rear
screw. Slide out
the relevant pin.
Plug the open
holes with the
plugs which you
will find in the
plastic bag containing the instruction booklet.

You are advised to keep all transit devices so that they can be refitted if the
machine ever has to be transported again.

025

P0001

P1124

2

3

1

P1126

P1127

P1128

P0002

132993360 gb.qxd 10/25/02 9:27 AM Pagina 46 (Nero/Process Black pellicola)

Advertising