Allied Air Enterprises 4PGE User Manual

Page 3

Advertising
background image

506488-01

Page 3

Issue 1008

Location
Use the following guidelines to select a suitable location for
the unit.

1. Unit is designed for outdoor installation only. Unit must

be installed so all electrical components are protected
from water.

2. Condenser coils must have an unlimited supply of air.

3. For ground level installation, use a level prefabricated

pad or use a level concrete slab. Do not tie the slab to
the building foundation.

4. Maintain level within a tolerance of 1/4" maximum across

the entire length or width of the unit.

5. Do not locate the unit where the combustion air supply

will be exposed to any of the following substances:

Permanent wave solutions

Chlorinated waxes and cleaners

Chlorine-based swimming pool chemicals

Water softening chemicals

Deicing salts or chemicals

Carbon tetrachloride

Halogen-type refrigerants

Cleaning solvents (such as perchloroethylene)

Printing inks, paint removers, varnishes, etc.

Cements and glues

Antistatic fabric softeners for clothes dryers

Masonry acid washing materials

Chlorinated laundry products

Hydrochloric acid

Use of unit as a construction heater during any phase of
construction is not recommended. Very low return air
temperatures, harmful vapors, and operation of the unit with
clogged or misplaced filters will damage the unit. However,
if the installation and operating conditions specified below
are followed, use of this unit for heating of buildings or
structures under construction is permissible:

The vent hood must be installed per these installation
instructions.

A room thermostat must control the furnace. The use
of fixed jumpers that will provide continuous heating is
not allowed.

The return air duct must be provided and sealed to the
unit.

Return air temperature must be maintained between
60°F (16°C) and 80°F (27°C).

Air filters must be installed in the system and must be
maintained during construction.

Air filters must be replaced upon construction completion.

The input rate and temperature rise must be set per the
unit rating plate.

100% outdoor air must be provided for combustion air
requirements during construction. Installation of this unit
in its intended outdoor location will accomplish this.

The heat exchanger, components, duct system, air
filter(s), and evaporator coil must be thoroughly cleaned
following final construction cleanup.

Following the final cleaning, all furnace operating
conditions (including ignition, input rate, temperature
rise, and venting) must be verified according to these
instructions.

Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation. An
accessory lift kit can be purchased to aid in rigging (see
Figure 1). Spreaders whose length exceed the largest
dimension across the unit must be used across the top of
the unit.
Recommended spreader length: 3 ton and smaller
package units – 44", 3.5 ton and larger units – 54".

Units may also be moved or lifted with a forklift while still in
the factory-supplied packaging. The lengths of the forks
of the forklift must be a minimum of 42".

Using Accessory Lift Kit

Figure 1

To avoid possible
damage to unit
panels from lifting
clevis, place
packing material
between clevis
and panels before
lifting unit.

Spreaders

(Field Supplied)

Lifting Bracket

Accessory

Sheet Metal
Screw

Before lifting a unit, make sure that the weight is
distributed equally on the cables so that it will lift evenly.

CAUTION

Advertising