HP Virtual Connect 8Gb 20-port Fibre Channel Module for c-Class BladeSystem User Manual
Page 168
Advertising
Virtual Connect server profiles 168
c.
In the Confirmation dialog box, enter the name of the SAN fabric, and then click OK.
d.
Click the HP ProLiant BL680c G7 Server Blade device bay in the Hardware Overview section in the
left navigation tree. The Server Bay Status screen appears. Be sure that the Power Status/Control
status value is Off.
Advertising
This manual is related to the following products: