Installing the Server in a Rack

Rack Installation Overview

Installing the ProLiant DL760 G2 server in a rack requires the following steps
(detailed later in this chapter):

1. Select a site and unpack the server. Refer to the “Selecting a Site” and “Shipping

Box Contents” sections in this chapter.

2. Remove the power supply and I/O module shipping brackets and the shipping

screws. Refer to “Removing the Shipping Safeguards” later in this chapter.

3. Remove the processor and memory module, I/O module, media module, and

power supplies to lighten the chassis.

4. Install any expansion boards or other options, such as additional memory. Refer

to Chapter 4 and Chapter 5 to install many of the major options.

NOTE: If the operating system is preinstalled on the server, refer to the Factory-Installed
Operating System Software User Guide
that is included with the server.

5. Install the chassis in the rack and replace the modules and power supplies.

NOTE: Refer to the rack template included with the server for more details on installing
the server in a rack.

6. Connect the following cables: keyboard, mouse, monitor, network, storage, and

power. Refer to Chapter 6 for more information.

2-2

HP ProLiant DL760 Generation 2 Server User Guide

HP CONFIDENTIAL

Writer: Jennifer Hayward File Name: c-ch2 Installing the Server in a Rack.doc

Codename: Pioneer Part Number: 201264-002 Last Saved On: 6/17/03 9:22 AM

Advertising