HP ProLiant DL380 G6 Server User Manual

Page 59

Advertising
background image

Hardware options installation 59

12.

Connect one end of the power cable to the SAS backplane and the other end to the system board.

13.

Install the primary hard drive cage.

14.

Connect one end of each SAS cable to the SAS controller. For connector information, see the
documentation that ships with the SAS controller option.

15.

Install the air baffle ("

Remove the air baffle

" on page

27

).

16.

Connect the remaining end of each SAS cable to the backplane,

17.

Install the PCI riser cage.

18.

Install the access panel (on page

24

).

19.

Power up the server (on page

22

).

Advertising