HP XP RAID Manager Software User Manual

Page 359

Advertising
background image

HA Failover and failback

359

Scenario

1. A failure occurs in host A or in the P-VOL.

2. Host B detects the failure in host A and issues the takeover command

to make the S-VOL usable. Host B takes over from host A and continues
processing.

In the case of a host A failure, a takeover command executes a
swap-takeover

.

In the case of a P-VOL failure, a takeover command executes a
S-VOL-SSUS-takeover

.

3. While host B is processing, the P-VOL and S-VOL are swapped using

pairresync –swaps

and the delta data (BITMAP) updated by host B is

fed back to host A.

4. When host A recovers from the failure, host A takes over processing

from host B through the horctakeover swap-takeover command.

Advertising