Mini-sas y-cable option, Mini-sas y-cable, Option – HP ProLiant SL270s Gen8 SE Server User Manual

Page 42

Advertising
background image

Hardware options installation 42

10.

Connect all internal or external cabling to the installed board.

11.

Install the GPU cage (on page

23

).

12.

Install the SFF hot-plug drive cage ("

Install the hot-plug SFF drive cage

" on page

17

).

13.

Install the shipping brackets ("

Install the shipping brackets and shipping plates

" on page

19

).

14.

Install the server into the chassis ("

Installing the server into the chassis

" on page

31

).

15.

Connect the peripheral cables.

16.

Power up the server (on page

15

).

Mini-SAS Y-cable option

1.

Power down the server (on page

15

).

2.

Disconnect all peripheral cables from the server.

3.

Remove the server from the chassis (on page

15

).

4.

Remove the shipping brackets and shipping plates (on page

17

).

5.

Remove the SFF hot-plug drive cage

Advertising