Installation instructions, Checklists – GE JP356BMBB User Manual

Page 8

Advertising
background image

8

Installation Instructions

1

PRE-TEST CHECKLIST

A Remove all protective film, if present, and any

stickers.

B Check to be sure that all wiring is secure and

not pinched or in contact with moving parts.

C Check level of appliance.

D Check that the cooktop is properly grounded.

CHECKLISTS

2

OPERATION CHECKLIST

A Remove all items from the top of the cooktop

surface.

B Turn on the power to the cooktop.(Refer to

your Owner’s Manual.) Verify that all surface

burners operate properly.

C Check that the circuit breaker is not tripped

nor the house fuse blown.

D Check that conduit is securely connected to

the junction box.

E See Owner’s Manual for troubleshooting list.

NOTE TO ELECTRICIAN:

The power leads supplied with this appliance are

UL recognized for connections to larger gauge

household wiring. The insulation of these leads

is rated at temperatures much higher than

the temperature rating of household wiring.

The current carrying capacity of a conductor

is governed by the wire gauge and also the

temperature rating of the insulation around the

wire.

NOTE: ALUMINUM WIRING

• WARNING:

IMPROPER CONNECTION OF ALUMINUM

HOUSE WIRING TO THE COPPER LEADS CAN

RESULT IN A SERIOUS PROBLEM.

• Splice copper wires to aluminum wiring

using special connectors designed and UL

approved for joining copper to aluminum

and follow the manufacturer’s recommended

connector procedure closely.

NOTE: Wire used, location and enclosure of

splices, etc., must conform to good wiring

practice and local codes.

Advertising