Installation instructions, Prepare the air conditioner (continues), Prepare the case – GE AEE24DS User Manual

Page 10

Advertising
background image

Installation Instructions

10

Installation Instructions

PREPARE THE AIR CONDITIONER

(continues)

Remove the shipping screws located on

the top of the case.

Remove the ground screws from each

side of the case. Keep them in a safe

location. NOTE: Be sure to save the ground

screws. You will need them later in the

installation.

Slide the air conditioner from the case

by gripping the base pan handle, lifting

up on the air conditioner, and pulling

forward. Have a second person brace the

case. Do not pull or lift on the styrofoam

discharge area.

Your unit may come with internal

packaging. This packaging must be

removed prior to installing the air

conditioner back into the cabinet.

3

E

F

FRONT

Do not

pull

or lift

in this

area—

damage

to the

unit may

result

PREPARE THE CASE

Attach the top rail gasket to the bottom
of the top mounting rail.

Install the top mounting rail with 4 type A
screws from the inside of the case. Press
firmly to drive the screws into the gasket
and through the top mounting rail.

Slide each side rail onto the edge of each
according panel. The figure shows the
orientation of each accordion panel and
side retainer assembly relative to the case
from a top view of the unit.

Slide the left and right accordion panels
into the top and bottom mounting rails.

A

Top mounting rail

B

4

G

H

C

D

Top left

Top right

Bottom mounting rail

Side Rail

Side Rail

Window Filler Panel

Window Filler Panel

Advertising
This manual is related to the following products: