Installation instructions, Final setup, Warning – GE DCVH480EKWW User Manual

Page 24

Advertising
background image

Installation Instructions

24

LEVEL THE DRYER

Stand the dryer upright near the final location

and adjust the four leveling legs at the corners

to ensure that the dryer is level from side to side

and front to rear.

Raise

Lower

PLUG DRYER IN

Ensure proper

ground exists

before use.

1

FINAL SETUP

2

DRYER STARTUP

Press the POWER button.

NOTE: If the dryer has been exposed to

temperatures below freezing for an extended

period of time, allow it to warm up before pressing

POWER. Otherwise, the display will not come on.
The dryer is now ready for use.

SERVICING

WARNING –

Label all wires prior

to disconnection when servicing controls. Wiring

errors can cause improper and dangerous

operation after servicing/installation.

For replacement parts and other information,

refer to the back cover for servicing phone

numbers.

4

GROUNDING INSTRUCTIONS

This appliance must be grounded. In the event

of malfunction or breakdown, grounding will

reduce the risk of electric shock by providing

a path of least resistance for electric current.

This appliance is equipped with a cord having an

equipment-grounding conductor and a grounding

plug. The plug must be plugged into an appropriate

outlet that is properly installed and grounded in

accordance with all local codes and ordinances.

3

NOTE: Stacking installations may require a power

cord up to 6 feet in length.

Advertising