Planning information, Product dimensions and clearances, The installation space – GE ZFGP21HZSS User Manual

Page 3

Advertising
background image

Planning Information

3

PRODUCT DIMENSIONS AND CLEARANCES

These Monogram free-standing refrigerators require the

following clearances for proper air circulation, plumbing

and electrical connections.

Air Circulation Clearances:

• 1/8" on each side

• 1/2" at the back side

Installation in a corner:

• Allow 4" clearance on each side to an adjacent wall for a

90° open ing and access to drawers.

• Allow 15" clearance to wall on each side for removal

of drawers.

69-5/8"

35-7/8"

Depth Including Handles

29-1/2" - Tubular Handles

30-1/4" - Professional Handles

27-1/2"

Depth

35-7/8"

Case Width

THE INSTALLATION SPACE

The opening width must be at least 36".

Water And Electrical Locations

The opening must be prepared with the electrical and

water supply located as shown.
Additional Specifications

• A 115 volt 60Hz., 15 or 20 amp power supply is required.

An individual properly grounded branch circuit or circuit

breaker is recommended. Install a properly grounded

3-prong electrical receptacle recessed into the back wall.

NOTE: GFI (ground fault interrupter) is not recommended.

• The cold water line can enter the opening through the

floor or through an adjacent cabinet, as close to the back

wall as possible. The water line should be GE

SmartConnect

Refrigerator Tubing or 1/4" O.D. copper

tubing between the cold water line and water con nec tion

location at the rear of the re frig er a tor. Installation of an

easily accessible shut off valve in the water line is

rec om mend ed.

70" min.

36" min.

Electrical

Area

Wall View

Water Supply

Advertising
This manual is related to the following products: