Installation instructions, Bottom drawer, Step 5 remove the fresh food doors – GE ZFGP21HZSS User Manual

Page 8: Step 4 remove the freezer drawers (cont.)

Advertising
background image

Installation Instructions

BOTTOM DRAWER

REMOVE THE 2-PIECE BASKET
A.
Open the bottom freezer drawer until it stops.
B. The freezer basket rests on the metal slide brackets

and is held in place with swing locks.

C. Ture the swing locks from vertical to horizontal posi-

tion.

D. Lift the front of the basket up, rotate it towards you, and

bring it straight up to remove.

E. Lift the back portion of the basket up and out of the

drawer.

REMOVE THE BOTTOM DRAWER FROM THE
SLIDES
A.

Remove the hex head screws from each side of the

rail assembly.

B.

Remove the four screws attaching the slide brackets

to the connector brackets.

C. Remove the connector brackets and place
aside.
D.

Tilt the bottom drawer toward the refrigerator and

lift out.

E.

Set the bottom drawer on a non-scratching

surface.
F.

Push the rail assemblies back into the

cabinet.

STEP 5 REMOVE THE FRESH

FOOD DOORS

The top cap must be removed to access hinges.
It is best to remove one door at a time.
A. Remove 2 screws on top and 2 screws at the back

of the top cap. Lift off top cap.

B. Remove 2 screws holding top hinge to the case.

Carefully lift off left and right side doors.

8

STEP 4 REMOVE THE FREEZER

DRAWERS (CONT.)

Top

Hinge

Top Cap Screws

A

screws

Advertising
This manual is related to the following products: