Installation instructions, Important, Warming drawer custom panel accessory kit – GE ZKD910SFSS User Manual

Page 10: Tools and materials required, Parts supplied, Prepare custom panel, Before you begin, Zxd27b and zxd30b, Prepare drawer for panel installation, Remove original drawer front

Advertising
background image

10

TOOLS AND MATERIALS REQUIRED

• Phillips screwdriver
• Drill and appropriate bits

(Brad point recommended for drilling through wood

panels)

• Custom panel
• Custom handle (optional)
• Adhesive recommended for metal to wood
• Adhesive recommended for plastic to wood

PARTS SUPPLIED

• Lamp Jewel
• Metal mounting panel
This kit contains a mounting panel to support a trimless

custom drawer front up to 3/4” thick. The tubular handle

can be reinstalled onto the custom panel with longer

screws (not provided). Or, the original handle can be

replaced with a custom handle of your choice. (Handle

is not supplied.) Choose a custom handle to match or

complement cabinetry hardware.
IMPORTANT: The warming drawer should be installed

according to the installation instructions packed with the

product. The original drawer front will be removed and

replaced with a custom panel.
• Cut edges of the drawer panel will be seen and must

be finished for best appearance.

• The custom drawer front panel, both raised and flat

design, should be constructed in the same manner as

typical cabinet doors.

• Order the custom drawer panel from the cabinet

manufacturer. Be sure to provide the exact dimensions

so that the panel is constructed accurately.

• Order the optional custom handle to complement or

match surrounding cabinetry handles.

PREPARE CUSTOM PANEL

• The custom panel must be sized to fit the dimensions

shown for your model.

• Drill a 5/16” diameter hole through the appearance

side of the panel. This hole will allow the indicator “ON”

light to be visible through the custom panel. The cut

edges will be covered by the overlap of the lamp jewel.

– A Brad point drill bit is recommended.

A = 26-3/4” for 27” Wide Models

A = 30” for 30” Wide Models

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT

Save these instructions for

local inspector’s use. Observe all governing codes and

ordinances.

Note to Installer – Be sure to leave these instructions

with the Consumer.

Note to Consumer – Keep these instructions with your

Owner’s Manual for future reference.

Installation

Instructions

WARMING DRAWER CUSTOM

PANEL ACCESSORY KIT

ZXD27B AND ZXD30B

For installation of 27” and 30” wide warming

drawer custom panel and custom handle.

PREPARE DRAWER

FOR PANEL INSTALLATION

• Open the drawer fully.
• Turn the warming drawer off.

REMOVE ORIGINAL

DRAWER FRONT

• Remove the two screws on each side and the one

screw at the bottom of the drawer edge.

• Remove the two screws on the inside of the drawer at

the top. Retain all screws.

– Support the drawer front as you remove screws to

prevent the possibility of falling.

STEP 2

STEP 3

STEP 1

A

10-1/2"

1-13/16"

1-3/4"

Drill 5/16" Dia.

Through Custom

Panel For Lamp Jewel

Advertising
This manual is related to the following products: