Gas connection instructions, Inst – Anetsberger Brothers SLG40 User Manual

Page 9

Advertising
background image

9

GAS CONNECTION INSTRUCTIONS

GAS CONNECTION INSTRUCTIONS

GAS CONNECTION INSTRUCTIONS

GAS CONNECTION INSTRUCTIONS

GAS CONNECTION INSTRUCTIONS

Installing your

ANETS Fryer requires the fol-

lowing procedure, after its legs or casters are pro-
perly attached and it is in its desired location.

1. Ensure that the gas safety valve control knob

in the fryer has its OFF position next to the
valvemark.

2. Ensure that the gas supply inlet line valve is

closed (crosswise to the line direction).

3. Ensure that the fryer’s thermostat is set to

OFF.

4. Connect the ½” gas supply line to the gas line

adapter on the lower rear of the fryer.

5. Turn the gas supply line valve ON; then, check

all gas supply line joints and couplings for
leaks using soap suds or a leak-check solu-
tion, after the fryer is in its desired location.

6. Refer to Fryer Operation Recommenda-

tions and Fryer Operating Instructions to
begin using your

ANETS Fryer.

CASTER LEVELING INSTRUCTIONS

(Continued)

INST

INST

INST

INST

INSTALLA

ALLA

ALLA

ALLA

ALLATION REQ

TION REQ

TION REQ

TION REQ

TION REQUIREMENTS

UIREMENTS

UIREMENTS

UIREMENTS

UIREMENTS

(Continued)

6. Reinsert each mounting bolt through the

caster mounting plate; next, place a spacer of
the required size on the bolt before inserting
the bolt into the bottom of the fryer.

7. Repeat step 6 for all remaining bolts.

8. Tighten all four bolts with locking nuts evenly

and securely against the bottom of the fryer.

9. Return the fryer to its desired location. Lock

the front casters to prevent fryer movement
and check again for wobbling or rocking.
Repeat steps 4 through 8 until no wobbl-
ing or rocking occurs. When the fryer no
longer wobbles or rocks, perform step 10.

10. Next, perform the “Fryer Restraining

Device Installation Instructions.”

!

WARNING

DO NOT use a flame to check for leaks.

Advertising