Ag Leader EZ-Guide 250 All Port Cable Installation User Manual

Ag Leader Equipment

Advertising
background image

2202 South Riverside Drive, P.O. Box 2348, Ames, IA 50010

Phone: 515-232-5363 Fax: 232-3595 Internet: http://www.agleader.com

Part No. 2005928 Rev A

1

Installation Instructions: All Port Cable – EZ-Guide 250

The EZ-Guide 250 Implement Switch adaptor cable (p/n 4001514) is designed to allow the use of an Ag Leader Implement Switch (p/n 4000335) with the EZ-Guide
250 lightbar for accurate area logging and acre counting.

Extension cable (p/n 2000453-x) should be used to extend the implement switch cabling to a suitable mounting location.

P/N 4001541-6 is designed to extend the length of the NMEA output extension of the All Port Cable.

Figure 1 shows the Implement Switch Adaptor (p/n 4001514) being used with the EZ-Guide 250 all port cable p/n 4001442 (TNL p/n 64045). The adaptor will plug
into the Radar/Switch 3-pin Deutsch connection on the all port cable.

The Ag Leader Implement Switch can be connected to the Implement Switch adaptor with any extension cables (p/n 2000453-x) that may be needed.

If an extension is needed for the NMEA output connection to an Ag Leader monitor p/n: 4001541-6 can be used. A Null Modem cable (p/n 2000819) is required for all
Ag Leader monitors. For connecting to a computer, the Null Modem (p/n 2000819) is not required.

Figure 1


Advertising