MJM Yachts 40z Express User Manual

Page 47

Advertising
background image

CHAPTER 11

(3) Run the radar dome harness through the hole in the front of the strut, just behind where the
radar dome will sit. See Pic 2 above.

(4) After installing the radar on it’s platform and
running the harness inside the radar dome you will
need to remove 5 screws from the top of the metal box
(the cover will than hinge to the side-- see Pic 3) giving
you access to the radar connections). You will have 2
red wires, 2 black wires and a plug with 7 smaller
wires attached to it.

(5) With a small flat head screwdriver loosen the
positive and negative screws at the white terminal box.
Plug the two red wires in the positive side and the two
black wires in the negative side. The plug with the
seven smaller wires will be plugged right in front of the
white terminal box where the red and black wires are.
See Pic 4. It can only plug in one direction. Make sure
it’s connected and pushed in all the way and that the
small gauge wires are in good conditions and not
making too much of a bend. Slide the cover back in
place (See Pic 5) and make sure the shield wires are
sitting in the cable groove right at the edge of the
opening. The grounding shield wires need to be
sandwiched between the cover and the base of the
metal box. Reinstall metal plate and radar dome cover.

(6) Look for a yellow tag inside of the KVH dome with
a screw; Very important, this screw is for shipping
purpose only. This screw needs to be removed before
you can run the unit

- 46 -

INTERIOR EQUIPMENT

Advertising
This manual is related to the following products: