Optional thinfilm installation – Sol Transit Shelter Security Lighting User Manual

Page 6

Advertising
background image

6 rev. 0212 MKTG-IM-TSSL-001

Installation and Owner’s Manual

|

TSSL

7 rev. 0212 MKTG-IM-TSSL-001

Install the ThinFilm flexible solar array in accordance with all applicable codes.

Optional ThinFilm Installation

Connect flexible solar array MC type IV connectors to PV
harness. Route PV Harness from shelter to upper section of light
assembly.

Carefuly remove the protective film on the back of the flexible
solar array and secure on roof shelter by gently pressing to
adhere. Follow remaining steps in TSSL Quick Install Guide.
WARNING: Butyl adhesive coating is designed for first time
adhesion and should not be repositioned after adhering.

Remove ThinFilm flexible solar array from packaging and place
in desired horizontal surface of roof shelter to determine correct
positioning. Panel should be facing Equator (south in Northern
Hemisphere).Determine best route for PV harness route to the
upper section of the light assembly.

It is recommended that the PV harness be routed around shelter
roof to upper light assembly and discretely secured by clips
or other method to ensure a neat installation of the ThinFilm
panels(s). Alternately, a 7/8” hole can be drilled in shelter roof
above upper light assembly to route harness directly and secure
opening with elbow seal tight. Routing around shelter and
securing the excess PV harness is the preferred method.

Elbow seal tight

Advertising