Sol Transit Shelter Ad Light User Manual

Page 14

Advertising
background image

14 rev. 0512 MKTG-IM-TOLAR-TSAL-BACK TO BACK-003

Installation and Owner’s Manual

|

TSAL B2B Series

3.8

Routing PV Harness into Ad Kiosk

1. Route PV Harness from Solar Array into top of Ad Kiosk. Ensure a 7/8” hole is drilled to route the

harness into the Ad Kiosk and down into the Ad Kiosk base.

Note: Some shelters may already have a pre-drilled access hole and plate for routing
the PV harness into the shelter and down into Ad kiosk (Figure 19).

2. Once PV Harness in routed into Ad Kiosk, secure with elbow seal tight.
3. Routing may vary depending on type of PV array ie ThinFilm may require routing of PV harness over

top of shelter (Figure 18) or within shelter matrix (Figure 19).

FIGURE 17

ROUTING PV HARNESS FROM PANEL

FIGURE 18

ROUTING PV HARNESS FROM THINFILM

Advertising