A.R.I. D-090P EN User Manual

A.R.I. Water equipment

Advertising
background image

Underground Air Valve system D-090-P.

Maintenance Instructions.

1. Part one- General.

1

1. Routine service is an integral part of the standard procedure of a water supply

system. The recommended routine maintenance period is once or twice a year

depending on the water quality requirement of the individual system.

2

3

4

5

11

6

7

8

9

10

12

Number in

Drawing

Discription Material

1 Seal

Assembly.

2

One-way valve ( Vacuum Only ).

3 Shaft.

Stainless

steel.

4

Outer Cover.

Reinforced Nylon.

5 “O”

ring.

NBR.

6 Body.

Reinforced

Nylon.

7 Base.

Reinforced

Nylon.

8 Float.

Foamed

Polypropylene.

9

Entrance to Drain Valve.

10

Base “O” rings.

NBR.

11 Lock

Pin.

Stainless

steel.

12 “O”

ring.

NBR.

1

Advertising
Table of contents