BLOWER ASSEMBLY INSTALLATION
1. This power vented water heater comes with blower

assembly installed (see Figure 29).

2. After unit is set in place, make sure blower assembly is

still mounted securely. Make sure there is no damage
to blower.

HOSE

CONNECTION

PORT FOR

CONDENSATE

DRAIN

DILUTION

AIR

INLETS

8 in.

LOOP

TO

DRAIN

BLOWER

ASSEMBLY

Figure 29.

3. Make sure there is no packing material in the inlet or

discharge of the blower.

4. Make sure that the plastic tubing is still attached

from the air pressure switch to the port on the blower
housing. Make sure the plastic tubing is not folded
anywhere between the pressure switch and the blower
housing (see Figure 37 thru Figure 41).

5. This water heater is a polarity sensitive appliance and

will not operate if the power supply polarity is reversed.
Power to this water heater must be wired properly
(correct polarity).

6. Do not plug in power cord until vent system is

completely installed. The Power Vent operates on 110
-120 VAC. therefore a grounded outlet must be within
reach of the 6 foot fl exible power cord supplied with
the heater. The power cord supplied may be used on
a unit only where local codes permit. If local codes do
not permit use of fl exible power supply cord:

a. Make sure the unit is unplugged from the wall

outlet. Remove the screw and open panel on the
front of the junction box on the blower.

b. Cut

the

fl exible power cord, leaving enough to be

able to make connections. Remove the strain relief
fi tting from the box.

c. Install a suitable conduit fi tting inside the enclosure.
d. Splice

fi eld wiring into existing wiring using code

authorized method (wire nuts, etc).

e. Be certain that the neutral and line connections

are not reversed when making these connections.

f. Ground heater properly. This water heater must be

grounded in accordance with the National Electrical
Code NFPA 70 and/or local codes. These must be
followed in all cases. The water heater must be
connected to a grounded metal, permanent wiring
system or an equipment grounding conductor must
be run with the circuit conductors and connected
to the equipment grounding terminal or lead on the
water heater (see Figure 12; the wiring diagram).

g. Close the panel on the junction box. Make sure

that the access panel is secured shut.

7. The blower discharge boot is made to accept only

straight sections of 2” or 3” pipe. To start off with an
elbow, a short section of the straight pipe must be cut
and glued into the end of the elbow that will mount on
the discharge boot.

INSTALLATION OF VENT SYSTEM
Before beginning installation of piping system, thoroughly
read the “Vent Pipe Preparation” section of this manual.

PLANNING THE VENT SYSTEM
Plan the layout of the vent system from the vent termination
to the water heater considering all of the 90 degree and 45
degree elbows plus the number of feet of pipe that would
be needed to install the total vent system. The water heater
must be vented to the outdoors as described in these
instructions. This water heater must be vented separately
from all other appliances.

The unit may be vented horizontally through a wall or
vertically through the roof. Pipe runs must be adequately
supported along both vertical and horizontal runs.

Note: Do not use an elbow as a support point. Elbows are
not designed to carry the load or stresses of the venting
system if they are rigidly held.

It is imperative that the fi rst hanger (or support) be located
on the horizontal run immediately adjacent to the fi rst
90-degree elbow from the vertical rise. Support method
used should isolate the vent pipe from the fl oor joists or
other structural members to prevent the transmission of
noise and vibration. Do not support, pin, or otherwise
secure the venting system in a way that restricts the
normal thermal expansion and contraction of the chosen
venting material.

If the water heater is being installed as a replacement for
an existing power vented heater in pre-existing venting,
a thorough inspection of existing venting system must be
performed prior to any installation work. Verify that correct
material, as detailed in below, has been used, and that the
minimum or maximum vent lengths and terminal location
as detailed in this manual have been met.

HIGH AMBIENT TEMPERATURE INSTALLATIONS
This heater requires room air to lower the flue gas
temperatures before the gases pass through the vent
system. The dilution air inlets are located on the rear of
the blower assembly (see Figure 2 & Figure 29).
As the room temperature rises, the ability to lower the fl ue
gases lessens so special attention to the choice of venting
material is required. Establishing the ambient temperatures
where the heater and the venting is installed is very
important, especially in regions with warmer climates
or any region that experiences hot summers. Ambient
conditions hotter than 110°F require that the venting

28 www.statewaterheaters.com