Initial hookup, Initial hookup -2 – Summers 50' Superroller User Manual

Page 26

Advertising
background image

SECTION 3 – OPERATION

3-2

INITIAL HOOKUP:

1. Make tractor to hitch connection with locking draw pin and safety chain.
2. Retract jack and rotate into storage position.
3. Insure that tips and couplers are CLEAN. Plug Center Tilt Cylinder hoses into desired tractor

outlet. Adjust hydraulic flow rate to 35% of maximum.

4. Plug Wing Lift Cylinder hoses into desired tractor outlet. Adjust hydraulic flow rate to 35% of

maximum.

5. Connect safety Light Kit wiring harness to 7 pin receptacle.
6. If Land Roller is in Transport Position, follow “Steps Required to Unfold from Transport to Field

Position”, page 3-3.

7. INITIAL CHECK – with machine in Field Position

A. After receiving or assembling your Land Roller, it is a good practice to double check the entire

machine so all fasteners are securely tightened.

B. Make sure all grease fittings are in place and greased properly.
C. Inflate tires to recommended inflation pressure (see page 4-2), check that wheel nuts are

tightened to 240 ft-lb and check that wheel bearings are correctly adjusted.

NOTE: The first time the Land Roller is folded into Transport Position and after any machine ad-

justment, it is very important to follow “STEPS REQUIRED TO FOLD FROM FIELD TO

TRANSPORT POSITION”, page 3-5. In addition to these steps, it is very important to retract

hydraulic cylinders slowly to insure Cylinder Attach Eye Bolts are correctly adjusted and that

hydraulic hoses and wires are not stretched or pinched.

Advertising
This manual is related to the following products: