Main frame roller installation, Set-up of frame -3 – 2-12 – Summers 53' Trail-Type Superroller User Manual

Page 13

Advertising
background image

SECTION 2 - ASSEMBLY

Figure 1

DETAIL A

SCALE 1 / 10

A

CENTER

3/8/2012

9LR0410.iam/

8P4211

8P7122

8X0111

3/4" X 2-1/2"

8R8005

SNAP RING

8R8010

8X0306

3/4" LW

8X0265

3/4" LN

8P5080

BLOCK FRAME

AT ARROWS

AFTER DRUM IS INSTALLED

PLACE STANDS AT THE 4

LOCATIONS SHOWN TO

STABILIZE FRAME

OF GREASE ZERK

NOTE ORIENTATION

SNAP RING IS OPTIONAL.

DUE TO MANUFACTURING TOLERANCE THE SNAP RING MAY NOT BE NEEDED.

2-3

Main Frame Roller Installation (Instructions for 41’, 46’ & 53’)

(NOTE: 41’ shown in drawings)

MF1. Position 8P4211 on a flat even surface; block the roller to avoid unexpected movement.

CAU-

TION: The 11’ roller weighs 3300 lbs., use extreme care when moving rollers and frame com-

ponents.

NOTE: An H has been stamped onto one end of each roller. Position the center roller

with the H to the left. All other rollers should have the H positioned to the center of the machine.

MF2. Use a fork lift or crane to position the main frame 8P7122 over the center drum and lower the

frame so the roller axle stubs fit between the bearing hangers as shown in the Figure 1.

MF3. Install bearings with the

grease zerk toward the rear of the machine. Secure to bolt plates

with the hardware shown. Install reinforcement angles between the bottom attachment hole

on the inside of the bolt plate, as shown in Figure 1.

MF4. Install snap rings on each roller shaft. Ensure that the roller is centered in the bearings and

tighten the set screws.

MF5. Before removing the lifting device for the main frame, block the frame in the locations shown

in Figure 1, also install blocks under the roller to keep it from rolling.

Advertising
This manual is related to the following products: