Operation – Hot Max Torches PL-25 User Manual

Page 12

Advertising
background image

Operation

KDAR Company

Job Setup and Control Settings


Make sure you are familiar with and follow all safety precautions prior to beginning work.

Place the PL-25 as close to the work as possible and make sure you have all of the materials you will need to
complete the project. Following the operating steps is essential to safe and effective operation of the equip-
ment. Please read all instructions before beginning.

1. Insure the PL-25 On/Off Power Switch is in

the Off position.

2. Connect the air supply.
3. Connect the work lead to the work piece prior

to cutting.

4. Connect the unit to the power supply.
5. Switch the On/Off Power Switch to the on po-

sition.
- The fan should start immediately
- The green power indicator LED will turn on.

6. Set the output current with the output control

knob.
- Higher power for faster cutting speeds and
less dross.
- Lower power for reduced kerf with and heat
effected zone.

7. Push and hold purge button to set the gas pres-

sure.
- Pull up on air pressure control knob and turn
to set pressure.
- Adjust pressure to 70 psi.
- Release purge button.
- The pressure gage could show an increase in
pressure after air flow stops.
- Do not adjust pressure without air flow.

10

Advertising