L packing list, Streamline console – ConnectPRO Master-IT StreamLine Console User Guide User Manual

Page 4

Advertising
background image

StreamLine Console

3

l Packing List


These are required to install the StreamLine Console:
n

StreamLine Console: assembled "LCD panel +
keyboard + mouse pad" drawer + Power Adapter.








n

Rear bracket & extension kit: This kit contains two pieces of rear brackets and two pieces of aluminum
extensions. Make sure you have the correct kit to fit the depth of your cabinet. Note: the following lengths
are+

n

measured between "front pole and rear pole inside a rack cabinet" not the outside depth of a rack cabinet
enclosure.

RES-1

RES-2

RES-3

RES-4

Front Pole to rear pole distance

cm

inch

cm

inch

cm

inch

cm

inch

Minimum

49.5

19

1

/

2

57.5

22

5

/

8

67.5

26

5

/

8

77.5

30

1

/

2

Maximum

57

22

3

/

8

70.5

27

3

/

4

80.5

31

5

/

8

90.5

35

5

/

8













n

KVM Switch: KVM module box can be connected to a StreamLine Console or be used as a stand-alone
KVM switch.

Module type

SK-01

SK-18

SK-28

SK-216

No. of console port

1

1

2

2

No. of computer port

1

8

8

16

KVM switch inside

No

Yes

Yes

Yes

Model Indicator

1u1

1u8

2u8

2u16


n

Bolt-and-nut set

n

User's manual

Advertising