Installation – Clary GT Series User Manual

Page 12

Advertising
background image

T H E C O N T I N U O U S P O W E R C O M P A N Y

Page 12

INSTALLATION

f the unit is to be stored, it is recommended to
refresh the internal battery at least once every 90
days. To do this, plug the system in, position the
power On/Off switch to "ON" and allow the unit to

idle for at least 24 hours.
The GT unit is designed for installation in a
protected environment. Some important points to
consider when positioning a unit for operation:
A properly rated (preferably dedicated) outlet is

accessible for the six-foot power cord, supplied
with the unit. It is not recommended to modify the
supplied cord in any way nor should an extension
cord of any kind be used.

The cord paths in the system installation should

remain clear of foot traffic or anything else that
may disturb permanent connection.

The installation site should maintain an ambient air

temperature of less than 104

o

F (40

o

C). When the

environment for the system remains cooler during
operation, there is less stress on the batteries and
the internal electronics.

The air inlets, vents and fan should not be

obstructed or blocked in any way. The more
breathing space the system has, the cooler it
operates.

The air should remain free from excessive dust

and chemical fumes.

Once a location has been selected and the unit is
installed, it is ready for operation.
Allow at least 8 hours, after the system is first
installed, to fully charge the internal battery to a
maximum state.

I

Advertising