STEP 4. INSTALLING THE CONDUIT

Remove the conduit connection plate from the rear of the drawer body and rotate it as shown below.
The conduit hole (1

1

/

8

”) must be used.

1

1

/

8

1

3

/

8

1

1

/

8

1

3

/

8

1. Prepare the conduit cord shown in Figure 1.
2. Install the conduit cord as shown in Figure 2.

Conduit connection plate

Strain relief

Ring

Body

Figure 2

1”

3

1

/

2

3

/

8

1”

3

1

/

2

3 wire

4 wire

Knockout surface

Figure 1

3

/

8

For conduit installations, insert the strain relief (not included) into the conduit hole (1

1

/

8

”). Then thread

the conduit cord through the body of the strain relief and fasten the ring. Reinstall the bracket.

Installing a 3-wire conduit

• Aluminum building wire may be used but it must be rated for the correct amperage and voltage to

make the connection. Connect wires according to Step 4 depending on the number of wires.

• Wire used, location and enclosure of splices, etc., must conform to good wiring practices and local

codes.

1. Loosen the 3 lower terminal screws from the terminal

block.

2. Insert the center bare wire (white/neutral) tip through

the bottom center terminal block opening. On certain
models, the wire will need to be inserted through the
ground strap opening and then into the bottom center
block opening.

3. Insert the two side bare wire tips into the lower left

and the lower right terminal block openings.

4. Tighten the screws until the wire is firmly secured (35

to 50 inch-lbs.). Do not over-tighten the screws since
it could damage the wires.

5. Go to step 5 on page 10 and proceed with the

installation.

White

Black

Red

Ground
strap

Neutral

terminal

Wire tips

Red

White

Black

English - 9

02

CONNEC

TING THE POWER

Manual Installation_30 Oven_USA_DG68-00108G-03_EN.indd 9