St art art -up -up prep prep ara ara tions tions – Aruba Spa Hot Tub Models 2003 User Manual

Page 11

Advertising
background image

10

continuous copper wire equivalent in size to the circuit con-
ductors supplying this equipment or as required by local
electrical codes.

All field installed metal components such as rails, ladders,
drains or other similar hardware within 3 meters of the spa
shall be bonded to the equipment grounding bus with cop-
per conductors no smaller than #6 AWG wire.

Save these instructions.

ST

ST

ART

ART

-UP

-UP

PREP

PREP

ARA

ARA

TIONS

TIONS

Before performing the operations in this section, make sure
you have read and understood all of the previous instruc-
tions set forth in this manual. Make sure the spa has been
installed correctly, including electrical wiring connections as
specified in the previous sections. The following procedures
must be done in the order they are listed.

Things to check before turning on the power to the spa:

1. Make sure the spa is clean, and that there is no foreign
material in the spa.

WARNING

Do not run the pump until the spa is full of

water. Running the spa pump without

water could cause damage to the operating

system and void the warranty.

WARNING

Unions must be hand tightened before fill-

ing the spa with water. Failure to do so may
cause the unions to leak, which can damage

the spa pack, and voids the warranty.

Advertising