1. For 2” x 6” wall construction position shower

valve so that center of inlet ports are 2-1/8” ±
1/2” (50mm ± 13mm) from finished wall
ensuring the outlet port marked “T” is facing
down.

2. For 2” x 4” wall construction position shower

valve so that center of inlet ports are 1-3/8” ±
1/4” (50mm ± 6mm) from finished wall
ensuring the outlet port marked “T” is facing
down.

3. Make up connections to the appropriate inlet

ports, marked “H” and “C” on one valve and
reverse on the other, cold supply to “H” and hot
supply to “C”. Inlet connections are
combination 1/2” NPT and 1/2” sweat. Refer to
page 6 for cartridge removal and reversal.

4. To continue installations follow steps 4-9A on

page 4 or 9B on page 5.

To avoid confusion Hot and Cold inlets need to
be re-identified for future maintenance.

!

IMPORTANT

Excessive overheating of valve during soldering
may damage the cartridge and checkstops. Do
not heat valve any higher than needed to flow
solder. If a higher temperature method is being
used all internal components must be
removed
. See figures 8 for cartridge removal
and 10 for temperature limit setting.

!

IMPORTANT

BACK-TO-BACK INSTALLATION:

Acorn Controls

Division of Acorn Engineering Company

®

, A member of Morris Group International

VALVE TRIM INSTALLATION CONTINUES:
9B. SV16-LVR Valve Trim Installation:

Figure 7.
a. Slide valve sleeve 12 over valve body and

gasket 7.

b. Place escutcheon with gaskets 6 over

valve sleeve 12 and against finished wall
and secure with screws 8.

c. Push handle 13 onto valve stem and

secure with set screw 14.

BACK TO BACK DETAIL

HO

T

CO

LD

VIEW FROM REVERSED SIDE

2" X 6" BACK-TO-BACK

INSTALLATION

1

3
4

" (44)

MIN.

2

1
2

" (64)

MAX.

FINISHED
WALL

1

3
4

" (44)

MIN.

2

1
2

" (64)

MAX.

Manual #7802-116-000

Date: 07/10/14

FINISHED

WALL

13

8

6

12

14

FIGURE 7