Allied Telesis AT-SBx31CFC960 User Manual

Page 112

Advertising
background image

Chapter 6: Installing the Power Supplies

112

Figure 53. Lowering the Handle on the AT-SBxPWRSYS1 AC Power

Supply

8. To install a second AT-SBxPWRSYS1 AC Power Supply, repeat this

procedure.

After installing the AT-SBxPWRSYS1 AC Power Supples, do one of the
following:

If you purchased the AT-SBxPWRPOE1 AC Power Supply for the
PoE+ ports on the AT-SBx31GP24 PoE Line Cards, go to
“Installing the AT-SBxPWRPOE1 AC Power Supply” on page 113.

Otherwise, go to Chapter 7, “Installing the AT-SBx31CFC960 Card
and Ethernet Line Cards” on page 125.

Note

Retain the tie wrap that comes with the power supply. You will use it
to secure the power cord to the chassis when you power on the unit
in “Powering On the AT-SBxPWRSYS1 AC Power Supply” on
page 175.

Advertising
This manual is related to the following products: