Allied Telesis AT-x510DP-52GTX User Manual
Installation guide, Gigabit ethernet switch
Advertising
C613-04066-00 REV B
AT-x510DP-52GTX
Gigabit Ethernet Switch
Installation Guide
S2/52
S1/51
50
49
CONSOLE
2662
x510DP-52GTX
SFP+
FDX
HDX COL
1000 LINK
ACT
10/100 LINK
ACT
3
5
1
7
9
11
13
15
17
19
21
23
4
6
8
10
12
2
16
18
20
14
22
24
27
29
25
31
33
35
37
39
41
43
45
47
28
30
32
34
36
26
40
42
44
38
46
48
Advertising
Table of contents
Document Outline
- Contents
- Figures
- Tables
- Preface
- Overview
- Virtual Chassis Stacking
- Beginning the Installation
- Installing the Switch and its Power Supplies
- Installing the Power Cord Retaining Clip
- Installing Power Supply Modules
- Installing the Switches on a Table or Desktop
- Installing the Switch in an Equipment Rack
- Connecting AC Power to a Power Supply Module
- Power Wiring to a DC AT-PWR250R-80 Power Supply Module
- Starting a Local Management Session
- Monitoring the Initialization Processes
- Configuring the Switch for Stand-alone Operations
- Verifying the Status of VCStack and Activating VCStack
- Cabling the Stacking Ports
- Powering On the Stack
- Cabling the Networking Ports
- Troubleshooting
- Technical Specifications