Allied Telesis AT-IX5-28GPX User Manual

Page 69

Advertising
background image

IX5-28GPX Installation Guide

69

5. While another person holds the switch in the equipment rack, secure it

using standard equipment rack screws (not provided), as shown in
Figure 26 for horizontal mounting and Figure 27 for vertical mounting.

Figure 26. Mounting the Switch Horizontally in an Equipment Rack

Figure 27. Mounting the Switch Vertically in an Equipment Rack

6. If required, repeat this procedure to install the remaining switches in

the stack.

7. Apply power to the switch or switches, as described in the following

procedures.

S2/2

8

S1/2

7

26

25

CONSO

LE

IX5-28GPX

FDX

HDX

COL

1000 LI

NK

AC

T

10/1

00 L

INK

AC

T

SFP

+

2674

S2/28

S1/27

26

25

CONSOLE

IX5-28GPX

FDX

HDX COL

1000 LINK

AC

T

10/100 LINK

AC

T

SFP+

Advertising