Installation – Blodgett KTC-G Series User Manual

Page 9

Advertising
background image

OM-KTT/KTC-G 7

Installation

8. Adequate space for proper servicing and operation is required. DO NOT block

any air intake spacings to the combustion chamber or obstruct air flow.

9. After the kettle has been connected to the gas supply, check all gas joints for

leaks. A soap solution or other suitable gas leak detector should be used. Do not

use flame when checking for leaks.

10. Once the unit is anchored to a mounting surface, apply a small bead of silicone

caulk around the perimeter of the kettle base and seal the joint.

11. Make sure the water level is correct in the jacket, by confirming that the

level is near the middle of the sight glass. If the water level is low, follow the

instructions in Jacket Filling and Water Treatment in the Maintenance section of

this manual.

12. Check to be sure that the open end of the elbow on the outlet of the pressure

relief valve is directed downward. Be sure to read and follow the instructions on

the attached pressure relief valve tag.

Advertising
This manual is related to the following products: