Equipment checklist, Package contents, Optional rack-mounting equipment – Alcatel-Lucent OMNISTACK 6300-24 User Manual

Page 30

Advertising
background image

3-2

Installing the Switch

3

Figure 3-1. RJ-45 Connections

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.

Package Contents

• Gigabit Ethernet Switch
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the

brackets to the switch

• Power Cord—either US, Continental Europe or UK
• RS-232 console cable
• This Getting Started Guide
• User Guide

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment
available:

• Four mounting screws for each device you plan to install in a rack—these are not

included

• A screwdriver (Phillips or flathead, depending on the type of screws used)

RJ-45 Connector

Advertising