Installation ii (wooden header), Caution, Wiring diagram – Panasonic FV-20VQ3 User Manual

Page 6

Advertising
background image

6

INSTALLATION II (WOODEN HEADER)

1.

Install header between ceiling joists using nails or
screws. (Fig. 5)

2.

Install the ventilating fan to the header with long screws.
(Figs. 5 & 6)

Fig. 5

Fig. 6

Fig. 7

Ceiling joist

Header

Adapter

Ceiling joist

Ventilating fan

mm (inch)

Model No.

A

B

FV-20VQ3

315

454

FV-30VQ3

(12 13/32)

(17 7/8)

FV-40VQ3

380

518

(15)

(20 13/32)

3.

Insert the circular duct to the adapter.

Remove the junction box cover and secure conduit to
junction box knockout hole. (7/8 inch) (Fig. 6)

4.

Refer to wiring diagram.

Using wire nuts, connect house power wires to ventilat-
ing fan wires: black to black; white to white; green to
green. Replace junction box cover.

CAUTION

Mount junction box cover carefully so that lead
wires are not pinched.

Wiring Diagram

Long screw

Adapter

Circular duct

Junction box cover

Flange

Ceiling

5.

Finish ceiling work. Ceiling hole should be aligned with
the edge of the flange. (Fig. 7)

6.

Mount grille to fan body. (Fig. 4 of page 5).

Motor

White

Thermal Cut Off

Power Supply

AC120V 60Hz

Earth

White

White

Neutral

Red

Black

Black

Black

Green

Green

Capacitor

Live

Panasonic_E

19/02/02, 11:25 AM

Page 6

Adobe PageMaker 6.5C/PPC

Advertising
This manual is related to the following products: