8. Once the suction line is connected, the sponge insulation must be

pulled up to cover the quick connects. Tie or tape off the insulation to

prevent air infiltration and reduce water/ice formation on the suction

line.

All valves are open and the system is ready for operation. Remember,

the refrigeration couplings on this system are self sealing and, if the

need ever arises, the couplings may be disconnected without any loss

of refrigerant.

IMPORTANT: Since this system is equipped with pre-charged

refrigerant lines, it is the installing contractor’s responsibility to ensure

that the quick connect refrigerant couplings are properly mated and

are leak free. It is also their responsibility upon start-up to check the

system for proper operation and make any necessary temperature

control or thermal expansion valve adjustments.

Note: A drain line is required to be run by the contractor for this type

of installation.

CAUTION: Line set must not exceed 3 feet longer than required length

to complete connection or improper oil return may result in compressor

failure. Contact the Service Department with model and serial number

for further assistance.This information is also included on a tag

attached to the line set.

Some systems require a permanent connection to an electrical

service and a connection at the junction box located within the

condensing unit housing. Refer to the serial tag for all pertinent

electrical data. These systems must be connected to a power

supply disconnect switch and wired according to local and

national electric codes.

Connecting to the Evaporator Section Side

R

emote

R

efRigeRation

S

yStemS